• Motor Core, Stator Lamination, Motor Parts, Motor Iron Core
  • Motor Core, Stator Lamination, Motor Parts, Motor Iron Core
  • Motor Core, Stator Lamination, Motor Parts, Motor Iron Core
  • Motor Core, Stator Lamination, Motor Parts, Motor Iron Core
  • Motor Core, Stator Lamination, Motor Parts, Motor Iron Core
  • Motor Core, Stator Lamination, Motor Parts, Motor Iron Core

Motor Core, Stator Lamination, Motor Parts, Motor Iron Core

Tolerance: +/-0.01mm
Machining Method: CNC Stamping
Material: Stainless Steel
Specification: 1000*1000*1000
Trademark: HENGYUAN
Origin: Qingdao, China
Samples:
US$ 10/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
OEM
HS Code
3926909090
Production Capacity
1000000

Product Description

Product Description
1.0mm Metal Perforated Steel Plate Stainless Steel Sheet Metal
 
A. Raw Material  Copper ,BeCu, phosphor copper, Brass, Stainless steel, Aluminum, SGCC, SECC, steel, spring steel, Nickel-Silver... and all different kinds of metal;
 
B. SPEC    Roll material thickness is 0.05-10mm;sheet metal  thickness is 0.3-20mm;
 
C. Surface treatment  Gold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
 
D. Application  All different kinds of telecom products, loom, furniture, and so on ;
 
E. Quotation  Please provide the Formal drawings (normally, with DWG/STP/PDF file ),and make note with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet in 48-72 hours;
 
F. Prototype & Mould We make the prototypes or moulds according to the drawings that confirmed by both of us and customers! The lead time is depends on the structure and qty of parts, Normally, lead time for prototypes is 3-15 days; lead time for mould is 10-25 days;
 
G. Production We will provide samples according to the drawings to customers for approval. Then arrange the production  and confirm the delivery date according to the Purchase Order; Normally , the lead time for production is 5-30 days ,the structure of parts is different , the lead time will be different .
 
H. Package  Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.
 
Main Products
Motor Core, Stator Lamination, Motor Parts, Motor Iron CoreMotor Core, Stator Lamination, Motor Parts, Motor Iron CoreMotor Core, Stator Lamination, Motor Parts, Motor Iron CoreMotor Core, Stator Lamination, Motor Parts, Motor Iron Core

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now